How to write a quote request for a small batch of 3D-printed parts (with template)
By Sina Esfahani, OmniTechs · Published 22 November 2026
A quote request for a small batch needs six groups of information: the exact file and revision, the quantity per variant, the material and what the part must do, what has to fit and how the first piece is approved, the state in which the pieces arrive, and the date, address and any repeat order. Leave one out and the print shop has to guess or come back with questions, and two quotes for the same job stop being comparable. The template below covers all six, with a plain-text version for your email at the end.
The same groups appear in ISO/ASTM 52901, the standard on requirements for purchased additively manufactured parts. Its summary lists what customer and supplier should exchange at the time of the order: order information, the part definition, material requirements, the properties of the finished part, inspection and acceptance. You do not need the standard for sixty clips, but its list is a useful check.
The quote request template
The example column describes a fictional order of 60 cable clips in two colours. It is an illustration, not a real order, and contains no price.
The quote request template
| Field | What to write | Example (fictional order) |
|---|---|---|
| File and revision | File name with a revision or date, the units and the outer size | cable-clip_rev-C.3mf, millimetres, 24 × 18 × 12 mm |
| What you have | Print-ready file, a file that needs work, or only a sample or sketch | Print-ready file, exported and reopened to check |
| Total quantity | Number of pieces in this order | 60 |
| Variants | What differs per variant and how many of each | Same shape, 40 black and 20 white |
| Material | Your preference and whether it is fixed, or ask for advice | PETG preferred, open to advice |
| Intended use | Where the part is used and what handling or load it gets | Indoors under a desk, opened by hand now and then |
| What must fit | The mating part, its measured size and the action | Clamps on an 18 mm desktop edge and holds a 6 mm cable |
| Visible face | The face that must look clean | Curved outer face |
| Sample and approval | Whether you want one piece first and what it must show | One piece first: clamps by hand, stays put, comes off without tools |
| Delivered state | Loose, in sets, with hardware or assembled, and the packing | Loose, supports removed, one bag per colour |
| Date | Date for the first pieces and whether delivery in parts helps | First 20 by 11 December 2026, the rest may follow |
| Delivery | Postcode and country or pickup, and business or private | Business address in Zwolle, the Netherlands |
| Repeat orders | Whether you expect to reorder and what must stay the same | Possibly 60 more in spring, same revision and colours |
File and revision
A print shop prices and prints a file, not a description. Name the file so the version is obvious: a revision letter or a date in the file name is enough. If you later approve a sample, that name identifies what the run repeats.
State the units and the outer dimensions in the message as well. An STL file contains no scale, colour or material information, as Prusa's explanation of the format points out. A 3MF can carry more, but only if your export wrote it and the recipient's software reads it. The guide to what 3MF and STL retain shows what to check before sending. If you have no usable file yet, say so. The request then starts with design or repair work: see four starting points for a 3D print request.
Quantity and variants
Give the total and the number per variant, and say what makes a variant different. A different name or text changes the model. A different colour may leave the geometry unchanged. That distinction tells the shop which preparation can be shared across the run. Printing, removal from the plate, inspection and finishing come back for every piece, so the split affects both price and planning.
State the quantity you actually need. OmniTechs, for example, promises no fixed minimum quantity for a batch; other shops set their own rules.
Material and use
Write down what the part does: where it is used and whether it is handled, bends, carries load or sits near heat. A material that suits a decorative sample is not automatically right for copies under daily load. If you have a preference, name it and say whether it is fixed. OmniTechs prints small batches in PLA or PETG on four FDM printers. A colour name or a screen image does not establish stock: the exact grade and the available colour are confirmed in the quote.
Fit, sample and acceptance
If the part must fit something that already exists, describe the mating part, give its measured size and name the action: slide, clamp or come apart again. There is no universal clearance for every print, as the tolerances and clearance guide explains. Measure the counterpart rather than copying a tolerance from another project.
Then say how approval works. Do you want one piece before the run starts, and what must it show? Write the check as an action with a result, such as "closes, stays closed, opens by hand". The guide to assessing a 3D-printed prototype shows how to set criteria before you look at the result. Whether a trial is needed depends on how uncertain fit, appearance or function still are.
Delivered state and packing
State how the pieces should arrive: loose, grouped into sets, with agreed hardware or assembled. Removing supports, finishing visible edges, sorting variants and bagging per colour each take work per item that a shop cannot read from the file. Name the face that must look clean.
Date, delivery address and repeat orders
Give the date you need the first pieces, not only the date for the whole order. For larger quantities, delivery in parts lets you use the first pieces while the rest prints; OmniTechs agrees this in the quote. Say whether your date means dispatch or arrival. Add the destination, as a postcode and country or as pickup, because packing and carriage belong to the delivered total.
If you expect to reorder, say so now. A repeat order starts from the earlier reference and file revision. At OmniTechs, material, colour, price and schedule are confirmed again for each repeat, and an earlier order does not reserve stock.
Fit check, first article or prototype?
Each term answers a different question.
Fit check, first article or prototype?
| Term | What it answers | When to ask for it |
|---|---|---|
| Prototype | Does the design do its job? | Shape, size or function is still open |
| Fit check | Does this one connection work with the real counterpart? | The design is settled but one fit is uncertain |
| First article | Does the first piece of the run meet the agreed criteria? | Before the remaining pieces are printed |
| Reference sample | What exactly should a later run repeat? | You expect a repeat order |
In aerospace, the first-article check is formal enough to have its own standard: SAE AS9102 sets baseline requirements for performing and documenting a first article inspection. A small print run rarely needs that paperwork, but the principle carries over: one piece is checked against the agreed criteria before the rest follows. One accepted piece is the reference for the run, not proof that every later print is already approved.
What to ask the supplier back
Three questions make one quote comparable with another.
What is included in the price? Ask whether preparation, support removal, finishing, packing, delivery and VAT are in the total, and whether the figure is an estimate or a confirmed offer.
What triggers a quantity discount? Shops differ: a break can apply per order line, per band of material volume or per series of identical pieces. OmniTechs gives 5% from 25, 10% from 50 and 15% from 100 identical pieces on material, print time and plates, and charges preparation and the check of the first piece once per run.
What happens if the first piece fails? Ask who decides on the change, whether a second trial is priced separately and what it does to the date. A change after the first trial can affect preparation and scheduling.
Our field study of seven public calculators shows why 3D printing quotes differ for the same file.
Copy-paste version for your email
Replace the dots with your own details and delete lines that do not apply.
File and revision: ... (file name with revision or date, units, outer size in mm)
What I have: ... (print-ready file, file that needs work, or sample only)
Total quantity: ... pieces
Variants: ... (what differs, number of each)
Material: ... (preference, or "please advise")
Intended use: ... (where, handling, load, heat)
What must fit: ... (mating part, measured size, action)
Visible face: ...
Sample and approval: ... (one piece first, and what it must show)
Delivered state: ... (loose, in sets, with hardware or assembled; packing)
Date: ... (first pieces by, dispatch or arrival, delivery in parts)
Delivery: ... (postcode and country, or pickup; business or private)
Repeat orders: ... (expected or not, what must stay the same)
Questions: what is included in the price, what triggers a quantity discount, what happens if the first piece fails?
Send the filled-in template with your file to each shop you are comparing. At OmniTechs the first assessment of a request is free, and where fit or appearance is uncertain you approve a trial piece before the run starts. The small-batch 3D printing page explains how a run works, and the 3D printing cost page has the current rates and the calculator.

